The reality is that Lismore was built in the wrong place. Unfortunately, it is unlikely to be moved now, so there must be alternative solutions. I feel eventually, Lismore should be moved off the floodplain.

As buildings are replaced, the replacements should be built above the 16m flood height (i.e. off the floodplain). The flooding can be reduced in Lismore, but by using natural controls such as revegetation which slows floods, reducing maximum flood height. I feel Lismore will always be at serious risk from floods such as the 2022 flood, but the minor floods can be reduced in a cost-effective way.

Hopefully, the NSW government will understand the real costs of proceeding with the CSIRO proposal, then cancel the project completely. I feel it is not a project that can be completed one dam at a time: which means the project total cost could be in the trillions (i.e. far from feasible).

Even a conservative government would not allocate that sort of funding! What local residents do need is a definitive future plan that is economically feasible. Anything outside economic feasibility (such as the CSIRO proposal) should be permanently abandoned so local landholders are aware of future commitments.

Doug Foskey , Tregeagle