After five years of restoration and extensions, the Margaret River Hotel is preparing to welcome guests back, with accommodation to open in early January. The historic hotel on Margaret River’s main street will re-open with 28 rooms on January 7, following an extensive project led by Paul Holmes a Court-backed company Heytesbury in collaboration with architects Spaceagency and builder Valtari. Guests will be able to get a first glimpse of the revamped venue sooner, with its bar and dining room, Bernard’s opening on December 1. Named in honour of Margaret River hospitality pioneer Bernard McKeown, the venue holds a special place in the town’s history as the region’s first licensed premises, established in 1936. The project was expected to reopen in the first half of 2026 to coincide with the hotel’s 90th anniversary on April 11. Mr Holmes a Court told the Times in 2025 the hotel was a “challenging building on a challenging site” and was “pretty slow-going at times”. The completed hotel features 28 rooms, a parlour, pantry, study and a boardroom seating up to 32 guests. Mr Holmes a Court said the hotel had 90 years of rich history as the town’s gathering place, along with State and national heritage listings. “Our vision was to honour the hotel’s special place at the heart of Margaret River’s community and honour the Margaret River region’s position as a world-renowned destination for wine travel,” he said. The restoration has seen the building’s original facade reinstated, with new accommodation areas added, with rammed earth and recycled jarrah used in the design. Much of the original reception, lounge and dining room has also been retained, along with the building’s original fireplaces. Spaceagency director Michael Patroni said the aim of the restoration and extension was to celebrate the original hotel, while accepting there had been numerous changes and additions over the years. “The primary moves were to remove as much of the unsympathetic additions as possible and otherwise, to distinguish it from the original,” he said. “Significantly, cement render was stripped from the original hotel building to reveal the face brickwork, while maintaining the characteristic heavy-painted render on the 1980s additions. “This was reinforced by the landscape design, resulting in a building of two parts that highlights the significant heritage element while telling a bigger story.”