Thor Explorations (TSXV, AIM: THX) has released the results of a pre-feasibility study (PFS) for its Douta gold project in Senegal, a milestone that the Canadian miner says puts it on the path towards a multi-asset producer.

The PFS envisions a long-life gold mine capable of producing more than 400,000 oz. at an all-in sustaining cost of $1,493/oz. over its first four years in operation. This would generate $561 million in net cashflow to the company, after repayment of project capital of $253.5 million.

Over the entirety of its estimated 12.6-year mine life, the Douta project is expected to deliver 82,000 oz. of gold per annum — more than 1 million oz. in total — at an average AISC of $1,890/oz.

Using an assumed long-term gold price of $3,500/oz., the PFS gave the project an after-tax net present value (at 5% discount) of $633 million and an internal rate of return of 61%. Its payback period is estimated to be within one year.